THE DESIGN / BUILD ADVANTAGE

FASTER DELIVERY

Collaborative project management means work is completed faster with fewer problems.

COST SAVINGS

Inherent to the design /build model is a saving of approximately 10 % of the project cost.

EVERYONE IS ON THE SAME TEAM

When challenges are encountered on a project, pointing fingers is not an option, everyone rolls up their sleeves and works on a solution.

TOTAL ACCOUNTABILITY

When the same group that designs the project also builds, there tends to be much more attention given to pricing and scheduling in the design phase

COLLABORATION

Design/build cuts out the big egos so common in the design industry. In design/build the client retains total control over the project and the team is there to empower them.

BETTER QUALITY

Design/builders meet performance needs and can think out of the box for design requirements, often developing innovations to deliver a better project than initially imagined.